Subcontract-ready bitumen and civils. NSW Central Coast and Lower Hunter.

Subcontract-Ready Civil Works,
Kerb & Gutter, NSW

Subdivisions, council road repairs and rehabilitation, kerb & channel, asphalt overlays. Family-run on the Central Coast since the 1990s, with our own crew, plant and yard at West Gosford. Capability statement on request.

Urgent jobs · fast turnaround ABN 80 627 620 973 Workers Comp current VOC verified Own plant & yard
Request a Tender Submission πŸ“ž 0447 039 682

A real human replies to RFQs, usually within 2 working days. No procurement chasing.

25+ years on the Coast Council-standard scope SWMS & ITP standard Plant: pavers, rollers, profilers Crew of 8-14 + subbies Small, medium & large jobs

Civil scopes we deliver across NSW Central Coast & Hunter

Direct-to-council, principal contractor and subcontract scopes. We self-deliver asphalt and pavement civils with our own crew; slipform K&G via a long-standing subcontract partner. For commercial car park scopes see our commercial page.

πŸ›£οΈ

Roads & asphalt overlays

Profile, regulate, hot-mix asphalt overlay. Minor patching through to multi-kilometre rehabilitation. NSW council standard pavement specs.

🧱

Kerb & gutter (K&G)

Slipform and hand-formed kerb & channel, lay-back kerbs, vehicular crossings, pram ramps to council standard.

πŸ—οΈ

Residential subdivisions

Civil scopes for subdivisions: pavement, kerb & gutter, footpaths, line-marking, ITP sign-off and handover docs.

Capability statement

Insurance & compliance

  • Workers compensation: current, certificate available
  • Plant & vehicle insurance: comprehensive
  • SWMS, SDS, JSA, ITP supplied per job
  • WHS Act NSW 2011 compliant
  • Certificates of currency supplied with the submission

Plant & equipment

  • Asphalt pavers (small + medium box width)
  • Tandem & multi-tyre rollers
  • Cold planers / profilers
  • Tip trucks, water cart, sweeper
  • Slipform kerb machine (subcontract partner)
  • Tipper trailers, edge tools, hand crew

Recent reference projects

  • 20-lot residential subdivision, Wyong: pavement, K&G, footpaths (2024)
  • Council road rehab, 1.4 km, Central Coast LGA: profile + overlay (2024)
  • Industrial estate civils, Tuggerah: staged kerb & pavement (2025)
  • School driveway & bus zone reconstruction, Avoca (2024)
  • Aged-care campus access & kerb upgrade, Gosford (2024)

What our principals say

"Subbed BWB on a 20-lot subdivision. Documentation was sharp from the kick-off, ITPs signed at every hold-point. Made our handover painless."

Civil PM
Wyong Β· 2024

"Council road rehab, 1.4km. BWB's traffic management was textbook. Came in on programme, no community complaints."

Council Eng.
Central Coast Β· 2024

"Used BWB for K&G on an industrial estate. Slipform crew was tidy, levels were on, no rework. Will use again."

Site Mgr
Tuggerah Β· 2025

"Family-run, easy to reach Glenn directly. That matters when you need a decision at 4pm to keep the next day's pour on."

Builder
Erina Β· 2024

"They picked up a complex driveway-and-bus-zone job at a school during the holidays. Crew respected the timeline. Done."

School Bursar
Avoca Β· 2024

"Pre-tender capability statement was the best I'd seen from a Coast civil. Plant list, references, ITP sample. Easy decision."

Procurement
Gosford Β· 2024

How we engage

EOI / RFQ

Send the tender pack or scope. We'll confirm interest within 2 working days.

Site walk & pricing

Free site walk with your engineer. Itemised price, programme, exclusions.

Mobilisation pack

SWMS, ITPs, COC, plant list, supervisor CVs supplied prior to start.

Delivery + handover

Daily site reports, ITP sign-offs, as-builts, defects period management.

Request a tender submission or RFQ response

For council, civil PMs and builders. We respond within 2 working days.

Submission received

Glenn or the estimator will reach out within 2 working days to confirm interest and arrange the site walk.

For urgent procurement timelines, call 0447 039 682.

Procurement FAQs

What scopes do you self-deliver vs subcontract?

We self-deliver asphalt placement, profiling and minor pavement civils with our own crew and plant. Slipform K&G is delivered through a long-standing subcontract partner. Survey, line-marking and traffic management are delivered through approved subbies, listed in our capability statement.

Are you council-prequalified?

We deliver to council standards (e.g. CCC SD-001 series for K&G and pavement) and have completed prior works for principal contractors on council jobs. We are not currently on a panel; happy to register if invited.

What are your typical contract values?

Civil works range from small repairs up to mid-six-figure subdivision and rehabilitation packages. Best fit is in the A$50K to A$1.2M band.

Can you supply ITP samples and SWMS templates with the EOI?

Yes. We can supply redacted ITP, SWMS, JSA and a recent quality plan extract on request, usually within 24 hours of EOI.

Do you carry environmental management?

Yes. Basic Construction EMP supplied per job, including spill kit, sediment control and noise management for residential-adjacent sites.

Defects liability period?

Standard 12 months on civil works, written into the contract. We attend defect inspections at our cost.

Get our capability statement

Send your tender pack or just call. We'll confirm interest within 2 working days.

Request a Tender Submission πŸ“ž 0447 039 682

More than civils β€” every size of asphalt + civil

Small repairs to mid-six-figure subdivision packages. Council, principal contractor or direct β€” same crew, same standard.