Road construction contractor, Central Coast NSW. Family-run. Own plant. Own crew.

Road Construction Contractor β€” Central Coast NSW

Council spec or developer brief β€” BWB builds the road. Subgrade, base, pavement, asphalt surface, line marking. Own plant. Own crew. No subbies on the critical path. 30+ years on Central Coast roads.

New road buildsReconstructionWideningAsphalt overlaySubgrade & pavement Small, medium & large jobs
Quote My Road Job πŸ“ž 0447 039 682

A real human picks up your call, not a call centre. Free site visit, written quote.

30+ years on the Coast ABN 80 627 620 973 Own plant & paver Council roadworks ITP & SWMS docs sorted No subbies β€” our crew Documented quality system Small, medium & large jobs Real human answers, no call centres

Road Construction Scope

From a new estate street to a full council road reconstruction, BWB builds it end to end β€” ground up or surface down.

New road builds

Greenfield estate roads, rural access, internal subdivision streets. Subgrade through to hot-mix wearing course, built to the spec on your desk.

Road reconstruction

Failed pavement dug out and rebuilt. Full-depth reconstruction where the base is gone, not just a band-aid overlay.

Road widening

Adding a lane, a turning bay or a shoulder. Tie-in to the existing pavement done so the join holds, not cracks.

Asphalt overlay

Structural and regulating overlays over sound base. The right mix, the right thickness, rolled to density.

Profiling & subgrade

Cold planing, profiling to grade, subgrade prep and proof rolling. We do the dig and the seal β€” one crew.

Pavement design support

Got a brief but no pavement design? We work with your engineer on layer thickness and material so the road lasts the design life.

Plant & Crew Ready

We own the gear. No waiting on a third-party paver, no hire surcharges, no program blowout because someone else's machine broke down.

Pavers, rollers, profilers

Pavers, multi-tyre and steel-drum rollers, cold planers, graders, tip trucks, water cart. Own fleet, maintained at our West Gosford yard.

Same crew, quote to handover

The blokes who quote it lay it. They know council specs and they know how Coast soil behaves. They turn up on time.

Hot-mix supply lines

Direct lines to the local asphalt plants. We time the truck so the mix lands at the right temp, when the paver's ready for it.

Documentation That Gets You Across The Line

Council engineer, superintendent, principal contractor β€” they all want the paperwork. We have it ready before they ask.

ITPs, SWMS & JSA

Inspection Test Plans, Safe Work Method Statements and JSAs for every road activity. Hold points called when they should be.

Certs & spec compliance

Certificates of Currency on file. Work built to RMS and council road spec, with conformance records to match the tender.

QA & 12-month DLP

NATA compaction results, asphalt density cores, works-as-executed. Documented quality system, 12-month defects liability period.

Who We Work For

30+ years on Central Coast roads. Below is the shape of who calls us in.

Central Coast councils

Road reconstruction, rehab, widening, overlay, defect repair. Roadworks built and documented to council spec.

Developers

Residential and commercial developers needing subdivision roads built on program. In on program, off on program.

Head contractors & government

Civil head contractors needing a road crew that self-performs, plus government capital roadworks. Documentation to suit.

Recent road & pavement jobs

Road construction questions, answered

Do you build new roads or just resurface?

Both. New road builds from subgrade up, full-depth reconstruction, widening, and asphalt overlay on sound base. Whatever the brief calls for.

Do you work to council and RMS road spec?

Yes. Roadworks built and documented to council and RMS spec, with conformance records, ITPs and works-as-executed to match the tender.

Do you provide ITPs, SWMS and compaction docs?

Yes. ITPs, SWMS, JSAs, Certificates of Currency, NATA compaction results and asphalt density cores. Documented quality system, 12-month DLP.

How fast can you quote a roadworks package?

Drawings and scope in β€” written quote within a week for most jobs. Larger or staged road projects, around two weeks.

Do you self-perform or use subbies?

We self-perform. Subgrade, base, pavement, asphalt surface β€” all BWB plant and crew. No subbies on the critical path.

Road spec on your desk? Send it through.

Free site walk, written quote, full documentation pack on request.

Quote My Road Job πŸ“ž 0447 039 682

More from BWB β€” every size of asphalt + civil

Small, medium or large. Same crew, same standard, across the Central Coast.

Get your free road construction quote

Fill this in. We'll be in touch to organise the site walk.

Thanks, we've got it

We'll be in touch to lock in a site walk, then send you a fixed-price written quote.

In the meantime, feel free to call 0447 039 682.