Utility Pit Reinstatement Patch, Kincumber

Kincumber, Central Coast NSW

An access chamber in the road at Kincumber needed the asphalt reinstated around it. The crew cut the road back to a clean square around the cover and packed a fresh base in tight around it, with cones out along the lane. New asphalt went in around the frame and was worked down with a plate compactor until it sat level with the road. We then ran a torch along the joint so the new patch bonds to the old surface. The patch was still steaming when we finished it.

4.6 stars from 20 Google reviews A real person answers.

Glenn and his team were terrific. Such a difficult job made to look easy.

Garry Parnell

Working on a similar project?
Get a Quote.

Free site visit. Prompt written quote.

Call Us Get a Quote